It starts in January for 12 weeks
While we're at it, does anyone know why all our pedestrian crossings no longer have a green man box on the opposite side of the road, but TWO where you press the button (which are far less visible than the old system)? Has someone got shares in that company?
The works at Woodingdean are a fraction of the size of the Amex, hence only a few workers on site. The Amex is being built in the middle of a field but the crossroads works are engulfed by pedestrians, cars and shops. If we dug it all up at once how would the shops trade? If we dug up all the footways at once how would the children get to school safely. If we dug up all the roads at once how would you get to work? Pull your head out of the sand and think before you make such stupid remarks. If you research the project properly you would know that the works before christmas were preperation works by the utility companies and the works after christmas are to last a max of four months. Ignorance is bliss!
the works at woodingdean are a fraction of the size of the amex, hence only a few workers on site. The amex is being built in the middle of a field but the crossroads works are engulfed by pedestrians, cars and shops. If we dug it all up at once how would the shops trade? If we dug up all the footways at once how would the children get to school safely. If we dug up all the roads at once how would you get to work? Pull your head out of the sand and think before you make such stupid remarks. If you research the project properly you would know that the works before christmas were preperation works by the utility companies and the works after christmas are to last a max of four months. Ignorance is bliss!