Not always the case... depends if is design and build project.
We already have a design?
Not always the case... depends if is design and build project.
Although any of the above mentioned groups will follow the design plans, I don't think many people are taking this process serious enough. Choosing who will build the thing is the most important decision left to be made by Perry and co. I'm glad we are taking our time with this, because the decision made will effect the remainder of the stadium saga.
Now we know the 3 companys tendering who do you want to build the stadium
Buckingham group (MK Dons stadium)
Barr construction (Southampton & Plymouth)
Bowen construction (Twickenham)
I must have missed this. When did it come out that the tender process was down to these three?
About a month ago it was whittled down to three. Tender documents went out to those 3 a week or so ago. Back with the club mid August and contractor should be announced early September
Yeah, I saw that, but I'd never actually seen which three it was. I'm surprised because I fully expected McAlpine to still be in the mix at this stage.
the construction industry is rather dull