South Stand is all in-situ - up to 27 rows cast on site as per lower section of east stand.
how is the terrace shuttering held in place as each step is poured ?
There is quite a few tons of concrete per step onto a sloping surface which in addition to it own weight exerts a lot of of force onto the shuttering , yet i does not appear to be fixed mechanically each time, it just down to friction ??
Today has got to be the most boring day yet. Fiddling around endlessly with the thrust wall blocks, all ready for another step on the east stand terrace, but no pug, and at 2.30pm not a single bugger visible on the site. Has the club defaulted on a stage payment d'you think?
Got a feeling they are all getting ready in preparation for the demolition of the uni building,
Looks like they are digging up the foundation thingys for the South stand steel work? I think it was installed ages ago and has been buried since.
Steel erection on Monday
Steel erection on Monday
croydon seagull indeed. you need a good slapping, saying that though you would probably love it you shit stabbing arse bandit. who set light to the withdean. buy that man a drink i say pmslAmazing, thanks for the heads up NJ.
Steel erection on Monday