Do a good job on the stadium and you can stick 10 past us!
Shouldn't WE be taking it seriously then?
I was going to add that but thought it blindingly obvious
Do a good job on the stadium and you can stick 10 past us!
Shouldn't WE be taking it seriously then?
They're starting the second half of it today!
No problem. I know how much this stadium means to you having talked to some of your fans. I just hope you lot still talk to me when Swansea stick 4 past you in the cup
It's full steam ahead on the main stand today as it extends towards the Station!! Also seems to be a lot of activity on & in front of the terraces as well today.
The webcam just doesn't do justice to the size of everything. I'm lucky enough to drive past the site 4 or 5 times a week, and can't wait for 2011.
Won't the main stand be on the other side?
It's full steam ahead on the main stand today as it extends towards the Station!! Also seems to be a lot of activity on & in front of the terraces as well today.
yer, sorry. I meant THE Stand. I suppose its the main stnad at the moment thoughWon't the main stand be on the other side?
'Wire brush' is steel reinforcement for a wall which will hold the roof up
seeing the metalwork going down on the upper floor i wondered why it weren't the the normal concrete slabs, seeing he van with "metaldeck" on the side, went and had a look at their website, very impressive technique.
The speed of erection, .... provide just some of the benefits
NEW NOO NOO IS BACK !!!!!
And they've got the stadium on their site.
Multideck Metal Decking and composite floors from Metal deck
The development of Brighton Community Stadium commences on site late July
2009 involving the detailing,supply and installation of 19,000 m2 of Kingspan MD60 to the East,West and North Stands.
The project was secured from Watson Steel Structures (part of the Severfield Rowan Group) based in Bolton after an extensive redesign and tender process and is due to complete in July 2010.
I would think so - isn't the stadium due to complete in December 2010?July 2010 is that their parts completion date do you think
Indeed - the main structure will be 'finished' quite quickly - then its a lot of unseen stuff to get on with before its really finished.I can't help thinking this is going to look "almost done" very quickly indeed. Then while they're doing stuff like electrics, pitch laying and all that stuff, we'll have all the MOANERS on this thread prattling on about how long all the snagging is taking and ask why it isn't ready yet.