Jack Straw
I look nothing like him!
Lots of action on the foundations of the south stand.
Terracing being built at the foot of the east stand.
Blue shuttering is put in place and concrete poured in, a whole 100m long step done in one go.
When it's set, they move up etc before joining up the the pre-cast stuff already in place.
Saw Barry Izbak as I was about to leave, so expect so video footage.
Don't forget 36B too.
Millwall, here we come!
Terracing being built at the foot of the east stand.
Blue shuttering is put in place and concrete poured in, a whole 100m long step done in one go.
When it's set, they move up etc before joining up the the pre-cast stuff already in place.
Saw Barry Izbak as I was about to leave, so expect so video footage.
Don't forget 36B too.
Millwall, here we come!