Imagine the outcry if the ramp up events went horribly wrong and we endured another season at Withdean. Im not being a prophet of doom i just assumed like most that passing these things is a forgone conclusion. But there will only be a 3 month window from May-August to complete all the necessary requirements if something does go wrong.
However i have no idea about construction so could well be barking up the wrong tree here?