I thought PB said the capacity was ‘just under 32,000’, I might have been mistaken.

I was assuming that the target final capacity was around 32,500.

Someone in post #557 recently ascertained that the capacity would end up at 32,750 after these works.

Looks like it’s ended up c. 850 short of that.

Heads will roll.
 








DarrenFreemansPerm

⭐️⭐️⭐️⭐️
Sep 28, 2010
17,445
Shoreham
Yes, but the club have in effect confirmed that with the NS shelf and literally all works complete, just shy of 32k is the final capacity.

Surely that’s not quite right? They’ve added seats already to raise the capacity to approximately 32k, surely adding an additional tier on the North and North East corner will raise it again, or has that idea been scrapped?
 


Weststander

Well-known member
Aug 25, 2011
69,271
Withdean area
Surely that’s not quite right? They’ve added seats already to raise the capacity to approximately 32k, surely adding an additional tier on the North and North East corner will raise it again, or has that idea been scrapped?

The c.1,150 new seats comprise:

350 NS shelf (see post #596)
50 NE lounge (post #600)
750 from filling random gaps, bunching up rows where there was unnecessary space.

That’s our lot.
 




Terry Butcher Tribute Act

Well-known member
Aug 18, 2013
3,673
The c.1,150 new seats comprise:

350 NS shelf (see post #596)
50 NE lounge (post #600)
750 from filling random gaps, bunching up rows where there was unnecessary space.

That’s our lot.
But they haven't built a new NS shelf (or lounge, presumably)? There's plans for one but the construction hasn't been done

Sent from my SM-G960F using Tapatalk
 


Weststander

Well-known member
Aug 25, 2011
69,271
Withdean area
But they haven't built a new NS shelf (or lounge, presumably)? There's plans for one but the construction hasn't been done

Sent from my SM-G960F using Tapatalk

See post #620. He’s a clever guy, his interpretation is that it’s complete now.

I’d be genuinely interested if you or someone else found out that works to come will take capacity to well over 32k.
 


A1X

Well-known member
NSC Patron
Sep 1, 2017
20,537
Deepest, darkest Sussex
Someone in post #557 recently ascertained that the capacity would end up at 32,750 after these works.

Looks like it’s ended up c. 850 short of that.

Heads will roll.

Or we’re all going to have to budge up
 




DarrenFreemansPerm

⭐️⭐️⭐️⭐️
Sep 28, 2010
17,445
Shoreham
The c.1,150 new seats comprise:

350 NS shelf (see post #596)
50 NE lounge (post #600)
750 from filling random gaps, bunching up rows where there was unnecessary space.

That’s our lot.

I’m confused. The current capacity has been increased to nearly 32k by just adding additional seats around the stadium. There’s still the North Stand shelf and North East lounge to be added which, as you’ve said, will add another 400, so the total capacity is likely to be closer to 32.5k, right?
 


Terry Butcher Tribute Act

Well-known member
Aug 18, 2013
3,673
See post #620. He’s a clever guy, his interpretation is that it’s complete now.

I’d be genuinely interested if you or someone else found out that works to come will take capacity to well over 32k.
If you look back in this thread, there was originally a planning application submitted for the North Stand to be slightly reworked, with the big screen shifted and a new 'upper tier' similar to the one in the South Stand. The capacity they've found so far is without that new 'tier', so presumably if it's complete now the club have decided the costs aren't worth it (or planning permission was refused).

I am speculating though, i may be way off the mark.

Sent from my SM-G960F using Tapatalk
 


Jack Straw

I look nothing like him!
Jul 7, 2003
7,108
Brighton. NOT KEMPTOWN!




DarrenFreemansPerm

⭐️⭐️⭐️⭐️
Sep 28, 2010
17,445
Shoreham
See post #620. He’s a clever guy, his interpretation is that it’s complete now.

I’d be genuinely interested if you or someone else found out that works to come will take capacity to well over 32k.

Could be wrong but I thought Bozza was specifically talking about the additional seats which were being added that didn’t require major stadium alterations, not the additional building work for lounges, tiers etc.
 


Rogero

Well-known member
Aug 4, 2010
5,834
Shoreham
It would nice to shave some of the field off near the ground just to park the buses About 50ft would be great for all the coaches.
 


Hugo Rune

Well-known member
NSC Patron
Feb 23, 2012
23,674
Brighton
I’m confused. The current capacity has been increased to nearly 32k by just adding additional seats around the stadium. There’s still the North Stand shelf and North East lounge to be added which, as you’ve said, will add another 400, so the total capacity is likely to be closer to 32.5k, right?

This would make sense.

Having just gone through various planning documents, the *application is for a maximum of 32,500.

I think you have it right, the approved North Stand Shelf & NE Lounge would take capacity close to or exactly to 32,500. From the drawings, the shelf sits in between the Control box and big screen with 5 rows. Plenty of room for 300+ seats.

*The main application is not marked as being decided?
 




Weststander

Well-known member
Aug 25, 2011
69,271
Withdean area
I’m confused. The current capacity has been increased to nearly 32k by just adding additional seats around the stadium. There’s still the North Stand shelf and North East lounge to be added which, as you’ve said, will add another 400, so the total capacity is likely to be closer to 32.5k, right?

We need a contractor who’s worked in the stadium lately, to post some pics.
 










dazzer6666

Well-known member
NSC Patron
Mar 27, 2013
55,533
Burgess Hill
This would make sense.

Having just gone through various planning documents, the *application is for a maximum of 32,500.

I think you have it right, the approved North Stand Shelf & NE Lounge would take capacity close to or exactly to 32,500. From the drawings, the shelf sits in between the Control box and big screen with 5 rows. Plenty of room for 300+ seats.

*The main application is not marked as being decided?

PB said ‘just under 32k’ at the forum tonight I think.
 


Hugo Rune

Well-known member
NSC Patron
Feb 23, 2012
23,674
Brighton
PB said ‘just under 32k’ at the forum tonight I think.

Indeed. Two theories on the capacity.

Theory 1: Capacity is 31,900ish with all work complete. All done. Fini!

Theory 2: All extra seats have been added to the existing structure; capacity now at 31,900ish.

But, north stand shelf & NE Box yet to be built along with 400-600 extra seats taking capacity up to 32,500 in line with planning application.
 