Hornblower
Well-known member
- Jul 7, 2003
- 1,710
Calling all commuters, there seems to be a direct corrolation between over running engineering works and signal failure. Simple, don't bother with the engineering work!
Some lad kicks his football over the fence and it lands on the line and all the trains are delayed due to trespassing on the line.
A learner scooter rider slips in the rain and comes off sliding into a railway bridge and all the trains are delayed while they check for structural damage.
Any weather other than no weather is known as adverse weather conditions and another excuse for delays.
As for trains running with reduced carriages, what happened to the other ones, did they lose them ?
And we haven't even had any snow yet.
Some lad kicks his football over the fence and it lands on the line and all the trains are delayed due to trespassing on the line.
A learner scooter rider slips in the rain and comes off sliding into a railway bridge and all the trains are delayed while they check for structural damage.
Any weather other than no weather is known as adverse weather conditions and another excuse for delays.
As for trains running with reduced carriages, what happened to the other ones, did they lose them ?
And we haven't even had any snow yet.