I still cannot understand why all the work that has been done could not have been incorporated in the initial build. Surely everything could have been installed bar the actual fitting of seats. The work being done now would not have affected the initial planning for 22,500 seats. Maybe not so much the corners, but the East Stand was designed to have that upper tier at a later date and would have saved milions had the pre-cast concrete etc already been in place.