Jack Straw
I look nothing like him!
Steel for east stand going up at a rate of knots.
Should take 5 weeks, but at this speed, could be earlier.
Some of the pre-cast terracing to go on this was delivered on Wednesday.
Concrete being poured in to south stand foundations.
Thought I got myself on the 9.00am web cam photo, only to find that where I was at that time is obliterated with a huge rain drop!
Don't forget set 31B too.
Should take 5 weeks, but at this speed, could be earlier.
Some of the pre-cast terracing to go on this was delivered on Wednesday.
Concrete being poured in to south stand foundations.
Thought I got myself on the 9.00am web cam photo, only to find that where I was at that time is obliterated with a huge rain drop!
Don't forget set 31B too.