portlock seagull
Well-known member
- Jul 28, 2003
- 17,793
What exactly does this mean. The Builder asks for a deposit to reserve a slot and buy raw materials. The deposit is paid and a written receipt is received. Where does that fall?
When he doesn’t turn up and start the job!