marcos3263
Well-known member
https://www.theargus.co.uk/news/18062695.letter-editor-need-monorail-marina-town/
We all need to get behind this as this route will be a test run for the one up to the amex.
The zip wire trial hasnt worked out well enough although I always thought the tower would need to be a tad higher to reach 5.76km to the beach
We all need to get behind this as this route will be a test run for the one up to the amex.
The zip wire trial hasnt worked out well enough although I always thought the tower would need to be a tad higher to reach 5.76km to the beach