They should be working FASTER
Can someone please explain?
Fantastic,,looks like steps at the back 4 or 5 rows, then a bit of a slide.Can someone please explain?
Fantastic,,looks like steps at the back 4 or 5 rows, then a bit of a slide.Can someone please explain?
Fantastic,,looks like steps at the back 4 or 5 rows, then a bit of a slide.Can someone please explain?
What's the hole for
Edit: Sorry maybe I should be more specific - the hole next to the second entrance steps from the left in photo 2
Back 4 or 5 rows;the concrete blocks have been placed directly on to the steel itself.Whereas the concrete slope is the base for the concrete steps to be cast directly on to the terrace.
Cheers...building work not my strong point.
No! You're not local enough.
Oi! Give credit where it's due - I posted that info FIRST!!
Your right, im not local.....been traveling to Brighton to watch boys since early eighties
Fantastic,,looks like steps at the back 4 or 5 rows, then a bit of a slide.Can someone please explain?